Our people are carrying out the container devanning work very carefully in order to ensure the chiller is being moved out of the container without getting any scratch.
(cargo dimensions: 6.55m x 2.30m x 2.45m)


Moving the chiller to the spot for lifting needs some skills.


The chiller is being lifted from the ground to the second-floor workshop.

The 126 ton press frame is being discharged from a barge onto the heavy payload truck.
(cargo dimensions: 13.0m x 5.4m x 3.4m, cargo weight: 126 tons)

To lash and secure the 126 ton press frame on the truck before it goes on the road.

Our tractor is pushing the 126 ton press frame into the workshop because of the site restrictions.

Two 200 ton cranes are used to lift and position the 126 ton press frame into the 4.5 meter depth pit due to the height restriction of the roof.


It is an art of balance for lifting the 126 ton press frame without touching the lights overhead


The 126 ton press frame is being positioned precisely on the four stands inside the pit.